Checks the chain ladder against the claims of the latest calendar period: the chain ladder of the triangle without its latest diagonal predicts how much each origin develops in that period, which is compared with what was reported.
Arguments
- triangle
A triangle of cumulative claims, as for
chain_ladder.- ...
Arguments passed to
chain_ladder()for the earlier triangle, such asaverageorperiods.
Value
An object of class netsimr_reserve: a list with by_origin, a
data frame with each origin's claims at its previous age, the expected and the
actual development, their difference, the ratio of actual to expected, the
standard error of the expected development and the standardised difference;
total, the same for all origins; and chain_ladder, the chain ladder
of the earlier triangle.
Details
The triangle without its latest diagonal (each origin's latest value
left out) gives development factors \(f_k\) and Mack's \(\sigma_k\) and
factor standard errors. An origin with \(C\) claims at its previous age
\(k\) was expected to develop by \(C (f_k - 1)\), with a standard error
\(\sqrt{C^{2 - \alpha} \sigma_k^2 + C^2 se(f_k)^2}\) (process and parameter
error, \(\alpha\) as in chain_ladder). The standardised
difference (actual less expected, over its standard error) shows which origins
moved more than the method allows for: beyond about 2 in either direction is
worth a look. The total's standard error adds that the origins at the same age
share a factor. An origin that has a single value, or whose previous age has no
development factor in the earlier triangle (the oldest origin, at the end of the
triangle), has no expected development and is left out of the total.
See also
chain_ladder; merz_wuthrich for the
uncertainty of the next period's development.
Examples
ave <- actual_vs_expected(raa_triangle)
ave
#> Actual vs expected development of the latest calendar period
#>
#> origin previous expected actual difference actual_to_expected se z
#> 1981 18,662 172
#> 1982 16,169 47 535 488 11.402 120 4.050
#> 1983 22,863 868 603 -265 0.695 182 -1.456
#> 1984 26,083 1,147 984 -163 0.858 1,535 -0.106
#> 1985 25,955 3,958 225 -3,733 0.057 1,016 -3.675
#> 1986 12,935 2,111 2,917 806 1.382 992 0.813
#> 1987 10,946 3,203 1,368 -1,835 0.427 3,124 -0.587
#> 1988 6,947 4,092 6,165 2,073 1.507 3,073 0.675
#> 1989 3,133 6,935 2,262 -4,673 0.326 10,651 -0.439
#> 1990
#> Total 125,031 22,360 15,059 -7,301 0.673 11,708 -0.624
ave$by_origin[, c("origin", "expected", "actual", "z")]
#> origin expected actual z
#> 1 1981 NA 172 NA
#> 2 1982 46.92208 535 4.0504517
#> 3 1983 867.98197 603 -1.4557689
#> 4 1984 1146.81339 984 -0.1060883
#> 5 1985 3958.19260 225 -3.6751055
#> 6 1986 2110.82325 2917 0.8128652
#> 7 1987 3203.06059 1368 -0.5873377
#> 8 1988 4091.89296 6165 0.6746367
#> 9 1989 6934.62805 2262 -0.4386906
#> 10 1990 NA NA NA
